Project Name

Client

Project Remarks

Hydraulic Analysis of JIMCO Terminal

Pakistan State Oil Company Limited

 

Stress Analysis of 30″ & 20″ Pipeline – Sui Southern and  Northern Header

Pakistan Petroleum Limited

 

Automation of Town Border Station

Avanceon Ltd

Fed Via Solar Panels without any external power

Fire Fighting System Upgradation at PSO KTA

Pakistan State Oil Company Limited

Design for complete up gradation of FF system

Fall Arrest system design at Tarujabba Depot Loading/Unloading Gantry.

Pakistan State Oil Company Limited

 

Design of Warehouse

Best Petroleum Pvt. Ltd, Pakistan

Multiple Warehouse

Design of Underground Storage Tanks

SMART Technical Services, UAE

1 x U/G Mogas Tank (DxH : 2.5 m x 6 m)

With Cathodic Protection System

Stress Analysis of Bitumen Pipeline

SMART Technical Services, UAE

 
 Enhancement of Fire Fighting System  Lucky Motor Company, Pakistan  

Fire Fighting System Design at Mina Al Fahal Terminal

SMART Technical Services, Oman

New Fire Pump Addition and water capacity enhancement + Foam Line Addition

Internal Floating Roof Installation at Mina Al Fahal Terminal

SMART Technical Services, Oman

Product change form Jet to Mogas and installation of new IFC

Naptha Conversion project at Mina Al Fahal Terminal

SMART Technical Services, Oman

New Naptha Ship Loading addition

Single Buoy Mooring (SBM) Relief System for Subsea Pipeline

SMART Technical Services, Oman

Automated Relief System for Subsea Pipeline

Design Of Daulatpur Terminal

Fast Oil Pvt. Ltd, Pakistan

2 x HSD Tanks (DxH : 15 m x 14.63 m) – 2 kT

1 x Mogas Tank (DxH : 23 m x 6 m) – 1.8 kT

Design Of Baluchistan Terminal

Fast Oil Pvt. Ltd, Pakistan

1 x HSD Tank (DxH : 22 m x 13.5 m) – 4.35 kT

1 x Mogas Tank (DxH : 22 m x 13.5 m) – 3.84 kT

1 x U/G Mogas Tank (DxH : 23 m x 3 m)

Design Of Shikarpur Terminal

Fast Oil Pvt. Ltd, Pakistan

1 x HSD Tanks (DxH : 15.84 m x 14.63 m) – 2.1 kT

1 x Mogas Tanks (DxH : 15.84 m x 14.63 m) – 2.1 kT

10” HSD pipeline design